General Building

National Rowing Centre. County Cork

Contract Details:

Cumnor Construction Ltd. carried out the role of Works Contractor and PSCS for this project.

This project comprised of the extension and refurbishment of the existing training facility. The work included extending the existing facility and the addition of another floor over the main footprint of the building. A viewing balcony was located at this level. Accommodation within the facility included gym, changing areas, toilets, meeting rooms, boat bays, foyer, offices, kitchen, and function room.

A protected access route on the existing road was provided to ensure that the facility could remain open to the public and operational throughout the contract.

Contract:

Extension and Refurbishment of National Rowing Warehouse and Community Resource Centre, Farran, County Cork

Client: National Rowing Union
Year: 

R.N.L.I Lifeboat Station. Youghal, County Cork

Contract Details:

Cumnor Construction Ltd. carried out the role of Works Contractor and PSCS for this project.

The works included the construction of a two-storey building. Construction was in blockwork with reinforced concrete, steel and timber structural elements.  External materials included natural stone cladding and rendered walls.

Internal accommodation included a large boathouse, changing rooms, showers, office and operations room. Mechanical and electrical works were carried out throughout the building. Site work including soft and hard landscaping.

Noise and Traffic management plans were prepared by Cumnor Construction Ltd. and approved by An Garda Síochána.

Contract:

Construction of R.N.L.I Lifeboat Station, Youghal, County Cork

Client: R.N.L.I
Year: 

Strancally Castle. County Waterford

Contract Details:

Cumnor Construction Ltd. carried out the role of Works Contractor and PSCS for this project.

This contract was for the construction of a new swimming pool connected to the existing castle. In keeping with the historical nature of the castle, and the importance of keeping the new pool adjacent to the existing castle, the pool was constructed below ground.

The work consisted of the construction of a 25m long indoor/outdoor pool with a rising floor that became an outdoor terrace when the pool was not in use. A bar and poolside lounge, jacuzzi, spa, gymnasium and professional treatment room were also constructed.

Limitations on levels demanded a creative roof solution. This entailed the use of long-span precast units to maximise span without the need for internal columns.

A large skylight was constructed with glass beams to support it. One end of the pool was separated from the outside by a fully automatic frameless glazed door that sliced through the pool water surface.

Contract:

Construction of Swimming Pool at Strancally Castle, Knockanore, County Waterford

Client: Gianni Alen Buckley
Year: 2007

Kenmare Community College. County Kerry

Contract Details:

Cumnor Construction Ltd. carried out the role of Works Contractor and PSCS for this project.

Kenmare Community School was built in 1820. The building is a 19th century three-storey convent and a protected structure.

The contract involved demolition, refurbishment and alterations to the existing building as well as associated site and ancillary works. Internally, a new concrete ground floor was poured and underfloor heating put in place. An internal lift shaft structure was installed. Fabrication and erection of pitch pine roof trusses to match the existing was also carried out.

The original slate roof was stripped down and all defective rafters replaced or repaired as necessary to the roof and dormers. New leadwork was carried out. The roof was then re-slated using the original natural slate. New fascia and soffit boards were erected along with new bargeboards.

The existing cast iron windows were restored to their original design. New lintels were also inserted. The stone surrounds to all existing windows and doors was restored including corbels, plinths and string courses. Cast iron gutters and downpipes were replaced as necessary. The external render was replaced to match the original design and specification.

Contract:

Conservation and Refurbishment of Kenmare Community College, Kenmare, County Kerry

Client: Department of Education
Year: 2004

ALTUS Apartments. Cork City

Contract Details

Cumnor Construction Ltd. carried out the role of Works Contractor and PSCS for this project.

The project involved the construction of twenty-nine high specification apartments. A number of different blocks ranging from seven storeys to two storeys were built. The buildings were constructed of a mixture of reinforced concrete and blockwork walls, along with steel element structures. Balconies were finished in hardwood decking. The apartments achieved the A-Energy rating. The heating system is a very economical Heat Recovery System. All glazing was triple glazed.

Due to the presence of fill material on site extensive deep excavations were required to remove this material and locate solid ground underneath. This required the removal of up to six metres of fill material in places. The sides of the excavation and adjoining buildings were protected at all times. Piling was also required on the site.

External works included new foul and storm water systems with attenuation tank and interceptor. A substantial amount of planting, trees and lighting were installed The existing pavement and roadway at the main entrance was finished with granite paving and existing cobbles.

Contract:

Construction of Altus Residential Development at Sundays Well,Cork City

Client: Blarney Properties
Year: 2011

Dunnes Stores. Clonakilty, County Cork

Contract Details

Cumnor Construction Ltd carried out the role of Works Contractor and PSCS for this project.

The contract was for the full construction of a new Dunnes Stores facility at Clonakilty, County Cork. Cumnor supervised, managed and co-ordinated all subcontractors on site including Mechanical and Electrical specialists.

Contract:
Construction of Dunnes Stores Facility, Clonakilty, County Cork.
Client: Dunnes Stores
Year: