The project included:
- Site clearance.
- Demolition Works Trench excavation.
- Removal and replacement of existing precast concrete kerbing.
- Re-surfacing of the existing raised pedestrian walkway and replacement of the guardrail to same.
- Ducting installation.
- Chamber construction.
- Bases for dual charging points.
- Installation of 8nr new E-Charger Points.
- Installation of electrical ducting throughout the carpark for future E-Charging points
and Astro Turfing the areas in the location of the new E-Charger Points. - Mini pillar installation.
- Cable installation and terminations.
- Commission and testing of dual charging points.
- Resurfacing and line marking works.
- Landscaping works and miscellaneous Carpark Safety Works including footpaths, raised pathways,
road-marking’s, tactile paving and dropped kerbing in this carpark and the lower carpark area.