Established 1983
CORK +353 21 4381104
DUBLIN +353 1 866 5975
  • PROJECTS PORTFOLIO
  • General Contracting

Commercial & Industrial

Teamwork.com Offices. Cork City

Contract Details

Cumnor Construction Ltd. carried out the role of Works Contractor and PSCS for this project.

This contract involved the fit-out of an existing building for Teamwork.com.  The work extended across the first, second and third floors of the building. The project was designed in line with a modern office facility and included breakout rooms, open plan areas, private office rooms, meeting rooms, a canteen, and the provision of a slide from the third floor to the first.

The work included the complete installation of mechanical and electrical services. Roads and access ways were kept open at all times. The ground floor of the building was occupied during the construction so great care was taken to ensure the safety and welfare of these people.

A temporary Traffic Management Plan was put in place to ensure minimal disruption while the works were ongoing. Emergency exits and normal building access was maintained for the duration of the project.

Contract:

Teamwork.com Office Fit-Out (3 Floors), Park House, Blackpool, Cork City

Client: Teamwork.com
Year: 

Bord Gáis Offices. County Cork

Contract Details

Cumnor Construction Ltd. carried out the role of Works Contractor and PSCS for this project.

The project were completed under the Public Works Form of Contract for Minor Building and Civil Engineering Works as Designed by Bord Gáis Energy.

The project involved the architectural, mechanical and electrical fit-out of the Bord Gáis Energy offices in Cork City. The contract consisted of the provision of workstations to have a capacity of seventy-four desks, four hot work areas, six cellular offices, five meeting rooms, print areas, reception and waiting areas, coffee lounge, communications room, support rooms, gym and associated shower facilities.

This work required the coordination of specialised Mechanical and Electrical contractors, maintaining site access, ensuring deliveries of plant and equipment to the site as well as the storage of materials safely in a restricted space.

The work was carried out in a live office environment and required sensitivity to the working arrangements of the client. The project was completed in phases. Cumnor Construction Ltd. personnel also assisted the Bord Gais Energy employees in their relocation to the new space. There were strict deadlines for this work and Cumnor Construction Ltd. met these deadlines.

Contract:
Office Renovation Works and Fit-Out at Cork Airport Business Park, County Cork
Client: Bord Gáis Energy
Year: 

Red Hat Offices. County Cork

Contract Details

Cumnor Construction Ltd. carried out the role of Works Contractor and PSCS for this project.

The project involved the fit-out and refurbishment of an existing office building. The first floor of this building was occupied for the duration of the work. The contract consisted of demolition, the installation of new partitions and joinery,  new floor finishes, internal decoration and office equipment. Alterations to the existing mechanical and electrical installations were required. A new ventilation system was added to the roof.

The work was carried out in a live office environment that necessitated being sensitive to the working arrangements of the client. The contract was completed in phases. As the building was occupied, communal areas had to be kept clean at all times, escape routes kept clear and noise level restrictions adhered to. Out of hours’ work was carried out when required so as not to disrupt the daily operation of this live office.

Contract:
Fit-Out Works to Red Hat Office, Building 6700, Airport Business Park, Cork City.
Client: Red Hat
Year: 

Tower Shopping Centre. County Cork

Contract Details

Cumnor Construction Ltd. carried out the role of Works Contractor and PSCS for this project.

The work involved the construction of a shopping/retail foodstore, storage units, bank, off-licence, three shop units, road and site development works. The construction of a two storey building consisted of reinforced concrete foundations, together with a small basement in one section, concrete ground floor slab, external wall of brickwork and plastered blockwork, precast concrete first floor and stairs, pitched timber roof trusses with fibre cement slate finish and PVC coated Kingspan roof panels on structural steel beams. Also included was a full mechanical, electrical and window installation and a comprehensive range of wall, floor and ceiling finishes.

Site development works included bulk excavation, new access roads and parking areas, pathways and paving, new drainage and site services including gas, water and electrical services, boundary walls and landscaping. Connections to the public mains and utility services took place outside of the site boundary.

Contract:
Construction of a New Shopping Centre at Kilnamucky, Tower, Co. Cork
Client: Paddy O’Leary
Year: